| Date: |
11-8-2003 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
riveted Rt seatassy, steps assys |
|
|
Riveted Rt seat assy, riveted steps in, bolted steps to block/ribs. Riveted seat adj hinges to rt and left floors. Started installing floor skins |
||