| Date: |
2-10-2003 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Assembled left Flap |
|
|
Assembled nose assemblies, clecoed 3 nose assemblies, ribs, top and bottom skins. Had to level bench top, drill 5/8 inch holes in bench top from bottom skin (for clecos to fit in) Drilled all holes and trailing edge Disassmebled |
||