| Date: |
6-19-2016 |
|
| Number of Hours: |
0.00 |
|
| Brief Description: |
New Canopy (1 of 2) |
|
|
Spent 4 hours at the airport locating and drilling all the holes for the rivets along the horizontal side rails. Also fixed the alignment pin which fell out several months ago. Made a small solid block of aluminum that slid down the inside of the horizontal rail. Before installing I drilled and tapped the piece to accept the alignment pin. Then brought the canopy home to do all the finish work and upsize the rivet holes (to allow for expansion). |
||