| Date: |
12-16-2013 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Fitting canopy |
|
|
With Dave's help we got the canopy fitted and cut/sanded to size. Next is starting to drill the holes and fasten the canopy. There is currently barely a gap between the canopy material and the turtledeck/windscreen. The plans call for 1/16" to allow for expansion. Since the canopy material overhangs the canopy frame by a lot, I figure I can tweak the gap by hand sanding after the canopy is attached. |
||