| Date: |
10-26-2013 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Finish canopy frame |
|
|
Today I needed to drill and rivet the corner brackets to the horizontal frame members. With the canopy frame fully in place: 1. I marked the locations of the pilot holes in the horizontal square-section frame members. 2. I took those members off the aircraft and to the workbench, to pilot drill them. 3. Then I re-assembled the whole frame again, and set everything per the dimensions and offsets in the plans. 4. And then I drilled through the pilot holes, into the round steel corner brackets, adding clecos as I went. 5. Then it was back to the bench with the whole assembly, where I took it apart once more, deburred everything, and put it back together (photo 1). 6. Photo 2 is the frame fully assembled, laid loose on the cockpit. |
||