Date:    3-25-2012
Number of Hours:    1.50
Brief Description:    Guide pin made and installed
- Made the canopy latch guide pin (D02-17), photo #1. It was way too much metal to grind away to get the bullet point, so I used my Dremel cutoff wheel to carve away material from 4 faces, making a point. Then I used the grinding wheel and finally the Scotch Brite wheel.

- Per the instructions on D01 the 3/32" guide hole (photo #2) was used to drill through the square canopy slide tube, into the longeron to set it's location.

- The the canopy rail comes off, the hole is enlaged ONLY on the tube (not the angle), and an 8-32 tap is used to create threads (photo #3).

- After cleaning everything I used JB Weld on the threads of the pin to lock it in place in the square tube (photo #3).

- Went back to the longeron and cleaned up the hole with the deburring tool and some sandpaper.