| Date: |
6-27-2012 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Control bungee + hinge cotters |
|
|
- Made the bungee that holds the elevator at or below neutral (photos 1 &2). This completed Sheet C01, except for the control rigging, which won't happen until we're almost ready to fly. - Installed the first cotter pin to hold the flap hinge pin in place. I snapped the end of the 3/64" drill bit, so I only got one done. |
||