Date:    8-29-2013
Number of Hours:    2.00
Brief Description:    Gear leg fairings
Kept going on the gear leg fairings.

- Cut the 4 hinge halves to length, marked them, and pilot drilled them.
- Clamped the hinges in place per the photo below.
- Pilot drilled through the hinge holes, through the fairing skin
- Updrilled and then deburred everything

I also put a little more filler around the nose of the lower cowling. Next I need to shape and sand it, then glass over it.