| Date: |
8-29-2013 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Gear leg fairings |
|
|
Kept going on the gear leg fairings. - Cut the 4 hinge halves to length, marked them, and pilot drilled them. - Clamped the hinges in place per the photo below. - Pilot drilled through the hinge holes, through the fairing skin - Updrilled and then deburred everything I also put a little more filler around the nose of the lower cowling. Next I need to shape and sand it, then glass over it. |
||