| Date: |
8-17-2012 |
|
| Number of Hours: |
1.75 |
|
| Brief Description: |
Wheels & brakes |
|
|
- Packed the wheel bearings and installed the wheels, brakes, retaining nut and cotter pins. Sheet L01 is now complete. - Located, drilled for, and secured the block for the brake cables. On a tail dragger it gets mounted to the engine mount (photo #2). - With the engine mount and block temporarily in place I marked the firewall for the holes for the brake cables. - Removed the engine mount and used a cobalt drill at low speed to drill the holes (photo #3). |
||