Date:    8-17-2012
Number of Hours:    1.75
Brief Description:    Wheels & brakes
- Packed the wheel bearings and installed the wheels, brakes, retaining nut and cotter pins. Sheet L01 is now complete.

- Located, drilled for, and secured the block for the brake cables. On a tail dragger it gets mounted to the engine mount (photo #2).

- With the engine mount and block temporarily in place I marked the firewall for the holes for the brake cables.

- Removed the engine mount and used a cobalt drill at low speed to drill the holes (photo #3).