| Date: |
11-23-2017 |
|
| Number of Hours: |
0.00 |
|
| Brief Description: |
ADSB Installation |
|
|
Ran the power and ground wires from the echoUAT box, to the panel and the ground block. Made the crimp connection at the "ADSB" switch on the panel. Added a Click-Bond so I would secure the wires and antenna with a zip tie near the echoUAT. 2 hours of work. On 11/24 I configured everything with a mobile phone app, then went flying. I saw traffic, and when I got home I got a report from the FAA that the system worked fine. So now I meet the 2020 ADSB mandate :-) |
||