| Date: |
6-5-2013 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Wiring... |
|
|
- Ran some wire bundles through the recently installed Click Bond supports. - Also used one Click Bond to support the static and pitot tubes, and the fuel sight guage tubing. - Made one end of the shielded P-Lead wires and attached them to the panel switch. Cut both to length on the engine-side of the firewall. |
||