Date:    5-2-2013
Number of Hours:    1.50
Brief Description:    Panel rivets + wiring
- Riveted the corner bracket at the right side of the panel.

- Installed the GPS antenna for the EFIS. It's stuck on the glare shield with double sided carpet tape. I drilled a hole big enough for the connector to get through, and installed a rubber grommet to protec the wire.

- Spent time laying out the wiring harnesses for the EFIS, comm radio and sensors, to get a feel for what has to go where, and to see which wires will be long enough and with will need to be spliced.