| Date: |
5-2-2013 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Panel rivets + wiring |
|
|
- Riveted the corner bracket at the right side of the panel. - Installed the GPS antenna for the EFIS. It's stuck on the glare shield with double sided carpet tape. I drilled a hole big enough for the connector to get through, and installed a rubber grommet to protec the wire. - Spent time laying out the wiring harnesses for the EFIS, comm radio and sensors, to get a feel for what has to go where, and to see which wires will be long enough and with will need to be spliced. |
||