| Date: |
12-27-2011 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Bolting down vertical tail |
|
|
- Installed the 3 anchor nuts in the forward face of T12-07 of the vertical stabilizer (photo #1), set with countersunk rivets at aft face (photo #2). - Aligned and cleane up all the holes in the vertical tail post, including deburring. - Set the tail by torquing the 3 forward bolts and cleco'ing the tail post (see single photo on next page). - Began loosely installing the tail post bolts (see photo on next page). |
||