| Date: |
4-6-2010 |
|
| Number of Hours: |
2.75 |
|
| Brief Description: |
Horiz and vert stabs |
|
|
- Finished drilling and riveting the hinge on the right side. This completes the horizontal stabilizer, other than the fiberglass tips. - Loosely installed the AN bolts in the vertical stabilizer. - Drilled and riveted the upper hinge on the vertical stabilizer. This completes the vertical stabilizer, other than the fiberglass tips. |
||