| Date: |
3-21-2010 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Finished T09-01 vert stab main spar |
|
|
Finished assembly T09-01, Main Spar of vert stab, by drilling the holes in the lower strap for the AN3 bolts. The final step of installing the bolts, I'll do when I get the hardware. |
||