Date:    3-21-2010
Number of Hours:    1.00
Brief Description:    Finished T09-01 vert stab main spar
Finished assembly T09-01, Main Spar of vert stab, by drilling the holes in the lower strap for the AN3 bolts. The final step of installing the bolts, I'll do when I get the hardware.