| Date: |
3-9-2010 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Continued with Horiz Stab |
|
|
- Installed the tip ribs - Squared up the spars by overlaying on a paper pattern created from the drawing measurements - Installed the outer 3 ribs on each side of the stab (6 total) - Next, need to debur and rivet |
||