Date:    6-25-2011
Number of Hours:    3.25
Brief Description:    LEFT flap construction
- Drilled the pilot holes into the lower rib flanges

- Flipped the flap over and did the same for the upper rib flanges

- Cleco'd the flap skin (photo #1) to the work bench, then used the thickness of the meter stick to rest the hinge on, to get the right hinge offset dimension.

- Laid out and drilled all the pilot holes in the hinge

- Used double-sided tape to adhere the hinge to the flap skin while holding the offset with the meter stick

- Pilot drilled through the hinge, into the flap skin

- Flipped the wing over, used the level as a straight edge to make sure the hinge was straight across it's entire length

- Drilled into the last face of the flap skin (through hinge holes)

- Updrilled everything to rivet holes size