| Date: |
10-13-2015 |
|
| Number of Hours: |
0.00 |
|
| Brief Description: |
Installed oil cooler |
|
|
Installed the oil cooler today, added safety wire in a few places, and made some tweaks to the baffles. Just a few small things left to do and then I can start it up. ======================== Running total of hours spent: Engine rebuild = 39.5 hrs Reinstall on the airframe = 6.5 hours + |
||