| Date: |
10-11-2015 |
|
| Number of Hours: |
0.00 |
|
| Brief Description: |
Completion of engine rebuild (1 of 2) |
|
|
Lots done tonight. - Made sure piston ring gaps were offset from one another - Pressed pistons into cylinders - Installed cylinder/piston assemblies - Install super tin (very important you do it NOW) - Install push rod tubes - Install the heads & torque - Install pushrods - Install the rocker arm assemblies (leave loose until prop is on and TDC can be better determined) - Install the trigger magnet assembly on the flywheel - Remove from engine stand ======================== Running total of hours spent: Tonight = 5.0 hours Total = 39.5 hrs |
||