Date:    10-11-2015
Number of Hours:    0.00
Brief Description:    Completion of engine rebuild (1 of 2)
Lots done tonight.

- Made sure piston ring gaps were offset from one another
- Pressed pistons into cylinders
- Installed cylinder/piston assemblies
- Install super tin (very important you do it NOW)
- Install push rod tubes
- Install the heads & torque
- Install pushrods
- Install the rocker arm assemblies (leave loose until prop is on and TDC can be better determined)
- Install the trigger magnet assembly on the flywheel
- Remove from engine stand

========================

Running total of hours spent:
Tonight = 5.0 hours
Total = 39.5 hrs