| Date: |
10-5-2015 |
|
| Number of Hours: |
0.00 |
|
| Brief Description: |
Bearing and case assembly |
|
|
Tried to attach the connecting rods to the crank, but needed a 1/2" to 3/8" socket adapter for the torque wrench and didn't have one. So I worked on the case halves, with the bearings and lifters. ============== Running total of hours spent: 1.5 2.5 3.5 2.0 2.5 2.0 1.5 2.5 2.0 1.0 1.0 1.5 (23.5 hrs total) |
||