| Date: |
9-26-2013 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Cowl + heater SCAT |
|
|
- Released the upper cowl (with the tabs) from the aluminized tape on the bottom cowl. - Added 3 more layers of glass to the tabs to make them thicker. - Found 2 stainless clamps and clamped the last two heater SCAT ducting. The heating system is now complete. |
||