| Date: |
4-16-2013 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Lower right baffle seals |
|
|
- Made the retaining strips for the seals - Drilled the pilot holes through the baffles and retaining strips - Laid out the baffle seals and drilled holes in them using the pilot holes |
||