Date:    10-12-2012
Number of Hours:    0.00
Brief Description:    More pics of day 1
Photo 1 shows the preinstalled prop hub.

Photo 2 shows the engine block halves opened for cleaing. There were aluminum flashings inside that I took out with a small file. Then I blew out the cases with compressed air, cleaned with mineral spirits, then blew out the cases again.

Photo 2 shows the block mated together temporarily, and the beginning of taping up all the mating surfaces, holes and studs, in preparation for painting.