Date:    6-16-2012
Number of Hours:    1.00
Brief Description:    Flush rivets inside spar tunnel
We had the 4th Annual Northeast Sonex Fly-in today in Keene, NH. We had 80 people for lunch, and 8 Sonexes there! Both are records for the event! We also had a Citabria there, so 4 of us got some tail wheel training.

- Tonight I installed the 48 CCC-44 flush rivets inside the forward spar tunnel (photo #2).

That completed sheet F01, except the 6 solid rivets, for which I need a rivet gun, and except for the lower skin, which does not go on until the day the aircraft gets inspected.