| Date: |
12-4-2011 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Instrument panel |
|
|
- Bent the upper flanges (to 66deg) of the two fixed ends of the panel (photos 1 & 2). - To make sure all 3 pieces added up to the correct overall length I marked 853mm on the table top, aligned and clamped the two fixed ends, and then aligned/centered the removeable center section on top (photo 2). - Clamped everything in place then drilled 3 pilot holes at each end of the removeable panel, through the fixed pane behind. - Installed 8-32 floating nut plates at the back side of the fixed panel (left side completed tonight) and screwed the parts together (photo 3). |
||