| Date: |
12-1-2011 |
|
| Number of Hours: |
2.75 |
|
| Brief Description: |
Forward fuselage floor structure (complete) |
|
|
Because I want the bottom skin/floor to be removeable, The only riveting is at the ends of the C06-02 assembly, and the rear angle support for the idler assembly. So when the floor is un-cleco'd, much of this stuff will be hanging in mid air, other than the clecos temporarily holding the forward end of the assembly to the aft spar tunnel angles. - Tonight I riveted ALL of those floor structure pieces ON MY WORKBENCH, totally outside of the aircraft. - Then I laid the entire assembly in the fuselage, cleco'd, then riveted as described above in the first paragraph. Tomorrow I will work on the final details for installing the seat pan. |
||