Date:    11-27-2011
Number of Hours:    3.00
Brief Description:    Forward fuselage floor structure
- Finished drilling then updrilling all the holes that join the C06-07 cap assembly to the C07-02 assembly.

- Finished drilling then updrilling the holes that hold C07-02 to the floor/skin.

- Drilled then updrilled the (2) horizontal gussets F10-24.

- Drilled most of the pilot holes to secure Idler assembly F10-16 to the various webs and floor/skin