Date:    11-4-2011
Number of Hours:    2.00
Brief Description:    Lower firewall
- Finished drilling a dozen holes in the lower firewall, where it attached to the upper firewall.

- Updrilled the two while cleco'd

- Installed the lower firewall stiffener (photos 1 & 2)