| Date: |
10-25-2011 |
|
| Number of Hours: |
1.75 |
|
| Brief Description: |
Spar Tunnel |
|
|
Got new drill bits today. They helped, but just barely. - Finished drilling the 5 or so holes for the stainless fuel filler well (photo #1). - Used a new countersink bit to make better countersinks for the spar tunnel angles. - Then I installed (with clecos) the forward and then aft tunnel webs, and pilot drilled all the holes along the top (photo #3). Next I will need to drill up from the floor, into the bottom flanges of the forward and rear spar tunnel webs. The floor should really get rigid, then. |
||