Date:    10-24-2011
Number of Hours:    1.25
Brief Description:    Finished sheet F03
Finished F03-01 assembly, which finishes sheet F03 for me.

Aligned, clamped, pilot drilled, updrilled, deburred and set the AN bolts in place. Rivets go in in a later assembly.