| Date: |
10-24-2011 |
|
| Number of Hours: |
1.25 |
|
| Brief Description: |
Finished sheet F03 |
|
|
Finished F03-01 assembly, which finishes sheet F03 for me. Aligned, clamped, pilot drilled, updrilled, deburred and set the AN bolts in place. Rivets go in in a later assembly. |
||