| Date: |
10-12-2011 |
|
| Number of Hours: |
1.75 |
|
| Brief Description: |
Lower firewall |
|
|
- Trimmed the lower firewall. It then fit very nicely. - Pilot drilled about 40% of the holes into the aluminum frames, and cleco'd in place (photo #1). - I tried drilling through the stainless steel firewall across the bottom, but NONE of my bits would go through the stainless. I need to get other bits. - So I drilled out and countersunk (where called for) the fuselage attach brackets (joining the forward and aft fuselage sections (photo #2). I got 75% of them done. |
||