| Date: |
9-10-2011 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
#1 turtle deck formers |
|
|
- Locates and pilot drilled the #1 formers and the splice plate at the top. - Located and pilot drilled the lower splice plates (left and right) that join the #1 formers to the box cross tie - Then updrilled all the holes to size for rivets |
||