| Date: |
8-8-2011 |
|
| Number of Hours: |
2.75 |
|
| Brief Description: |
F24-01 Cross Tie Box Ass'y |
|
|
Made the F24-01 Cross Tie Box Assembly for the fuselage. - Draw 5/32" offset line on legs of channels, per plans - Clamp channel to work bench, standing up - Clamp 2nd channel, 3" off of the first - Align one face of cap strip along offset line of ONE channel - Pilot drill and cleco in place - Measure 3" wide at one end of the assembly, clamp, pilot drill and cleco one end hole. - Move down the assembly with a ruler and measure a 3" wide assembly. - Assume channel may not be perfectly straight and move down assembly, measuring 3" pilot drilling and cleco'ing as you go, until you reach the other end of the assembly - Disassemble and debur - I put in 6 clecos, turned the assembly over, LIGHTLY clamped it to the work bench, then did the same thing as above, for the other cap strip. NOTE: PER THE DRAWINGS ONLY ONE CAP STRIP (the one with fewer holes) GETS RIVETED AT THIS TIME! - Riveted one cap strip in place. More photos on the next page. |
||