Date:    7-15-2011
Number of Hours:    2.00
Brief Description:    LEFT aft fuselage construction
- Riveted the left aft fuselage, except for the #5 channel, which needs to wait until I get the fuselage hardware.

- I had only half the parts I needed for the seat belt anchor points, so I used some paper patterns from my CAD program to lay them out and cut/drill them (the part is 20" long but I only had 8.5x11 paper at home, so I just extended the lines out from the paper patterns to get the full length).