| Date: |
6-27-2011 |
|
| Number of Hours: |
2.25 |
|
| Brief Description: |
Begin AFT FUSELAGE construction! |
|
|
Tonight I finally got to begin on the aft fuselage construction! - Spent a lot of time looking over and trying to understand the next 4 sheets of drawings. - Marked the right fuselage skin for a 3/4" bend along the forward vertical edge, then measured and marked the location of the vertical framing members. - Bent the forward edge as req (14 deg). - Put double sided tape on the upper longeron, alinged it with the top of the skin, and set the longeron. - Carefully turned over the skin and drilled 4 pilot holes for the longeron. Cleco'd in place then called it a night. |
||