Date:    6-27-2011
Number of Hours:    2.25
Brief Description:    Begin AFT FUSELAGE construction!
Tonight I finally got to begin on the aft fuselage construction!

- Spent a lot of time looking over and trying to understand the next 4 sheets of drawings.

- Marked the right fuselage skin for a 3/4" bend along the forward vertical edge, then measured and marked the location of the vertical framing members.

- Bent the forward edge as req (14 deg).

- Put double sided tape on the upper longeron, alinged it with the top of the skin, and set the longeron.

- Carefully turned over the skin and drilled 4 pilot holes for the longeron. Cleco'd in place then called it a night.