| Date: |
6-3-2011 |
|
| Number of Hours: |
2.75 |
|
| Brief Description: |
LEFT aileron construction |
|
|
- Got the last rib located and pilot drilled, then updrilled all the holes. - Pre-drilled small pilot holes in the hinge, set the hinge as I did for the right aileron, then - Started drilling the hinge into the aileron. Got a half dozen holes set. |
||