Date:    5-9-2011
Number of Hours:    2.50
Brief Description:    RIGHT wing preparations for riveting
Started back up on the RIGHT wing.

- Deburred the holes on an aft skin along the rear spar

- Enlarged the hole in the lower aft wing skin, and set the tie-down bolt in place and torqued the nut.

- Installed nut plates for the installation of the pitot assembly.


Reached 1,100 hours tonight.