| Date: |
2-11-2011 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
LEFT wing deburring |
|
|
1. Deburred the exterior of the upper aft skin 2. Removed the skin and deburred (both sides) of all the holes in the ribs 3. Drilled the 8 holes for the aileron bellcrank channels |
||