| Date: |
5-11-2010 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Finished Tunnel Channels |
|
|
Finished F16-02, tunnel zee. Made and finished F16-05; the other half of the spar tunnel. I have two small angle clips to make from .025 alum (sheet F16) and I will be done with all the channel/angle parts in the Z-drawings, other than the control surface skins and the wing nose skins. |
||