Date:    5-11-2010
Number of Hours:    2.50
Brief Description:    Finished Tunnel Channels
Finished F16-02, tunnel zee.

Made and finished F16-05; the other half of the spar tunnel.

I have two small angle clips to make from .025 alum (sheet F16) and I will be done with all the channel/angle parts in the Z-drawings, other than the control surface skins and the wing nose skins.