| Date: |
4-30-2010 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Right-hand bellcrank assembly |
|
|
Same as last night, but made the left-hand bell crank assembly tonight out of sub-assemblies W21-02R and W21-10. I cut the phenolic piece (W21-08), held the entire assembly down to my work bench with clecos, then drilled for the bolt, and finally the pivot. |
||