Date:    3-1-2008
Number of Hours:    1.00
Brief Description:    Began to rivet the rear spar
Began riveting the rear spar of the HS today. I thought that the rivets were too long, but after doing some research I learned that the shop head diameter gauge is a minimum diameter gauge, and a little over is ok.