| Date: |
3-1-2008 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Began to rivet the rear spar |
|
|
Began riveting the rear spar of the HS today. I thought that the rivets were too long, but after doing some research I learned that the shop head diameter gauge is a minimum diameter gauge, and a little over is ok. |
||