| Date: |
3-24-2020 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Right wing leading edge. |
|
|
Removed skins and leading edge from Left wing and installed Right wing skeleton onto wing stand. Leveled and installed top skins. Assembled Right side leading adge and installed onto spar. This is all a repaet of the left wing, so no pictures. |
||