Date:    7-12-2019
Number of Hours:    4.50
Brief Description:    Match drilling
Match drilled all components making certain to drill lower spar to skin holes at #30 there the CS4-4 pop rivets must be used. I'll use solid rivets where ever possible to reach them with the Rivet Squeezer.
NOTE: Added a "Date Stamp" to my photo's to keep better track of things.