| Date: |
12-7-2018 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
Left side HS |
|
|
All clecoed together. Match drilled all the #40 holes and disassembled for deburring, dimpling, and counter sinking. (NOTE: the 4th hole down on both sides of the main ribs was out of alinement just enough that a clecoe would not go in. Of course, "match drilling" fixed the issue. Just thought it was odd considering how well everything lines up.) |
||