| Date: |
8-8-2010 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Rear HS Spar Layout and Match Drilling |
|
|
Same type of match drilling the HS halves with the joining plate. Match drilled, placed and tagged the hinge plates on the back side. |
||