| Date: |
8-8-2010 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Front HS Spar Layout and Match Drilling |
|
|
Began construction of the horizontal stabilizer (HS) with match drilling and fitting the two front HS halves with the joining plate. |
||