| Date: |
2-21-2020 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Instrument panel |
|
|
Got the brackets fabbed up and installed that anchors the instrument panel to the longerons. Also temporarily installed the throttle quadrent sub panel. |
||