| Date: |
12-12-2009 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Doors |
|
|
Completed the fabrication and installation of the Pilot door. Riveted both pilot and passanger door headers. Painted the parts for pilot door and re assembled.. I will need to order larger self tapping screws as I have drilled the number 40 holes out to number 30 which was incorrect. I will bne sure not to do this on the passenger door. |
||