| Date: |
8-4-2007 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
The Tunnel |
|
|
Fabricated the angles for to secure the seat tunnel.Attached the seat belt brackets and the doublers that go behind in the tunnel. Attached the tunnel to the floor. Fabricated the front and top bearing for the control stick. |
||