| Date: |
2-6-2010 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Finalized Left Wing |
|
|
Finalized the interior of the left wing. Finished running the nav storbe wires and hard fuel lines. Added the wing root angle to rib #2 and riveted the entire wing. Ready for install to the plane |
||