Date:    2-6-2010
Number of Hours:    8.00
Brief Description:    Finalized Left Wing
Finalized the interior of the left wing. Finished running the nav storbe wires and hard fuel lines. Added the wing root angle to rib #2 and riveted the entire wing. Ready for install to the plane